Welcome to the official website of Tianjin Yixin Pipeline Equipment Co., Ltd!
Tianjin Yixin Pipe Equipment Co., Ltd.
  • Home
  • Products
  • Projects
  • News
  • AboutUs
English English
  • 中文 中文
>> Pipeline all position automatic welding machine
Pipeline all position automatic welding machine
>> Supporting equipment
Supporting equipment
>> Company News
Company News
>> Industry News
Industry News
>> Common Question
Common Question
>> After-Sale Service
After-Sale Service
>> Advantage
Advantage
>> About
About
>> Contact
Contact
>> honers
honers
  • Home
  • Products
    • >> Pipeline all position automatic welding machine
    • >> Supporting equipment
  • Projects
  • News
    • >> Company News
    • >> Industry News
    • >> Common Question
    • >> After-Sale Service
  • AboutUs
    • >> About
    • >> Contact
    • >> honers
  • English
    • 中文
01-video
Tianjin Yixin Pipeline Automatic Welding Equipment
Tianjin Yixin makes welding more efficient and convenient
05pic
Pipeline all position intelligent welding machine
Made in China serving the world
02pic
Low labor intensity high efficiency high qualification rate
Improve the competitiveness of engineering construction
03pic
Quality-based creative breakthrough
Tianjin Yixin is selected for pipeline welding equipment
01pic
Breadcrumb: Home > News > Common Question >

Notes for pipeline welding

Time:2017-02-21

In brief, pipe, welding material (baking, heat preservation), welding joint treatment (cleaning, type of break), welding precautions (current, voltage, influence of gas welding wind, rain and snow weather)

Pipe welding and inspection

(1) The welder according to the welding work instruction welding;

(2) The welder must hold a certificate on the post, not exceed the time limit for welding;

(3) Before welding should be the groove surface and groove edge within the scope of not less than 20mm dirt clean;

(4) Welding materials according to the requirements of the welding instructions baking, insulation, distribution;

(5) Welding arc should be carried out in the groove, strictly prohibited in the pipe wall arc;

6 NG process pipeline using electrode arc welding, CNG process pipeline using argon arc welding method, the previous layer is not finished welding the next layer, in welding should ensure the quality of arc starting and arc closing, arc closing should be filled with arc pit, layer indirect head should stagger each other;

7 in addition to the welding process has special requirements, each bead should be a joint welding. If for some reason is forced to interrupt, should take anti-crack measures. Rewelding must be checked to confirm that there are no cracks before continuing welding;

8 after welding each weld, should be easy to observe the edge of the weld with a marker to make welder mark steel number, and fill in the "welding record";

(9) in the following environment should stop welding (without protective measures)a, electrode arc welding, the wind speed is equal to or greater than 8m/s; B. During gas shielded welding, the wind speed is equal to or greater than 2m/s; C. relative humidity is greater than 90%;D. rainy days.

The surface quality of the attended welded joint shall meet the following requirements:

A. There shall be no cracks, no fusion, air holes, slag inclusion and splash;

B. No edging on welding seams.

C, weld surface shall not be lower than the pipe surface, weld residual height delta h should meet the following requirements:

(1)百% radiographic detection of welding joint, its delta h≤1+0.1b1, and not greater than 2mm;

(2) other welded joints, △h≤1+0.2b1, and no more than 3mm;

(3) the height of the fillet weld is not less than the thickness of thin pieces;

Previous:Nothing Next:Common methods of pipeline welding operation
Back

Contact:Manager Chen

Tel:+86-22-23889667

mobiles:+86 13820221715

   +86 13194693183

Copyright:COPYRIGHT © 2016-2025 yixinpipe ALL RIGHTS RESERVED

Support:Junyuan

Address:No.28 Mold Park B4, Saida Fourth Branch Road, Xiqing Development Zone, Tianjin